Suzhou Chunshenhu Road Rapid Transformation Electromechanical Project
Project Overview
Project Name: Suzhou Chunshen Lake Road Rapid Transformation Electromechanical Project (Tunnel Lights, Street Lights, Ordinary Lighting Fixtures)
Project address: Xiangcheng District, Suzhou
Project time: 2019
Project Introduction: The Yuanhetang West Tunnel starts from the east side of Tonghu Road and ends at the west side of Yuanhetang, with a total length of 3450 meters. It is a two-way six lane, three pair two lane entrance and exit ramp. The tunnel is in the form of two holes and one pipe gallery: the two sides are lanes, the upper layer of the middle pipe gallery is a cable channel, the middle is a safety channel, and the lower layer is a water pipe trench channel. The tunnel is equipped with an underground substation, rainwater pump room, wastewater pump room, ventilation room, and two above ground switch stations. The construction mileage range of this section: K1+040~K4+490。 The main construction content includes tunnel HVAC, water supply and drainage and fire protection, power supply and lighting, fire alarm system, and professional procurement, installation, and commissioning of civil engineering (two switch stations).
Real environment